Peace of mind for your data centre.

The FrontFoot® plinth system provides improved performance for key facilities such as hospitals, data centres, and infrastructure that cannot afford interruption. Our solutions put you in control - the proactive choice ahead of future earthquakes.

Design Guide coming soon - contact us for design support.

How can FrontFoot Plinth help you?

Damage reduction during earthquakes

Damage reduction during earthquakes

FrontFoot® acts like a shock-absorber to take some of the energy from an earthquake at plinth level before it reaches your key equipment. Where most facilities are designed primarily to protect lives, FrontFoot® takes this further by also focusing on damage minimisation.

Minimise downtime

Minimise downtime

With its focus on minimising damage, FrontFoot® reduces the likelihood of downtime for your critical equipment. Keep your facility operational when it matters most.

Lower the environmental impact of your facility

Lower the environmental impact of your facility

Damage reduction means less waste heading for landfill after an earthquake, and less new material required for repairs. A more resilient facility is also a more sustainable one.

How it works.

Standardisation & affordability

Standardisation & affordability

Seismic Shift technologies focus on performance, affordability, and buildability through the use of standardised sizes of all products. This speeds up the design process, reduces cost, and improves reliability. They are straightforward to design and install.

Installed in a resilient plinth

Installed in a resilient plinth

Devices are installed within a shock-absorbing plinth that isolates critical equipment from ground motion during a seismic event. When the ground shakes, the devices absorb and dissipate seismic energy before it reaches the facility, keeping critical operations running.

See it in action

See it in action

The Seismic Shift.

Design study: Canterbury IT Equipment Plinth
4
FrontFoot® devices
8m²
Plinth footprint
140mm
Plinth thickness
±20mm
System movement
FrontFoot Plinth installation

Keep your critical operations running.

Talk to our engineers about protecting your facility's most important assets.

Contact Us